Park City Prefab Works

Website Terms & Conditions

1. About These Terms

These Terms & Conditions establish the general requirements, responsibilities, and limitations associated with purchasing products and services from Park City Prefab Works, LLC (“Park City Prefab,” “Company,” “we,” or “us”).

Our business specializes in precision-manufactured, panelized building packages for residential and other approved construction projects.

By placing an order, submitting a project deposit, purchasing construction documents, or entering into an agreement with Park City Prefab, customers acknowledge and accept the applicable provisions of these Terms.

Specific project requirements, price adjustments due to applicable local code, deliverables, payment schedules, and contractual obligations may also be established through a separate written agreement.

2. Building Packages and Included Components

Park City Prefab supplies engineered building packages designed for efficient transportation and on-site assembly.

Depending on the selected design and executed agreement, a standard building package includes:

  • Engineered structural wall and roof panels
  • Roof trusses and applicable second-floor joists
  • Exterior windows and doors
  • Structural engineering for the supplied building components
  • Stamped building plans prepared for permitting
  • Delivery of the specified package to the approved project location
  • Virtual assembly training for the customer or designated contractor

The precise components, specifications, and services included in each purchase will be identified in the applicable project agreement.

Foundations, site preparation, utilities, mechanical systems, electrical work, plumbing, interior finishes, and other on-site construction services are not included unless expressly identified in writing.

3. Architectural Plans and Design Rights

All original architectural designs, drawings, renderings, technical specifications, and other proprietary materials developed or owned by Park City Prefab remain the intellectual property of the Company or its respective licensors.

Purchase of a building package or associated construction documents does not automatically transfer ownership of the underlying intellectual property.

Unless a separate written agreement provides otherwise, customers receive permission to use the supplied documents solely for the project and location identified in their purchase agreement.

Customers may share necessary documents with their architects, engineers, contractors, building officials, and other professionals involved in completing the authorized project.

Reproduction, resale, commercial distribution, or use of the documents for additional construction projects requires prior written authorization from Park City Prefab.

Nothing in these Terms restricts the independent professional rights of architects, engineers, or other licensed professionals in their own work.

4. Design Selection and Customization

Park City Prefab offers a selection of standard home designs, with opportunities for customization.

Adjustments to interior layouts may be accommodated during project planning, subject to engineering review and final approval.

Changes affecting the exterior structure, window and door openings, roof configuration, or other engineered elements may require additional design services, revised pricing, and extended project timelines.

All requested modifications must be reviewed and approved before the relevant plans are finalized or manufacturing begins.

Any additional design fees or changes to the original scope will be communicated to the customer for approval.

5. Project Reservations and Deposits

An initial deposit of $10,000 reserves a project with Park City Prefab and begins the preconstruction coordination process.

Following receipt of the deposit, the Company will arrange an initial project consultation.

Deposit cancellation period

Customers may request a full refund of their initial deposit within 14 business days of payment.

After the 14-day cancellation period, the deposit becomes non-refundable, except where otherwise required by applicable law or expressly agreed in writing.

The initial deposit will be credited toward the total purchase price of the customer’s building package.

Deposits do not guarantee a particular manufacturing date, delivery date, or final project price unless separately confirmed in writing.

6. Understanding Our Pricing

Park City Prefab Works reviews and adjusts its published building package prices periodically to reflect changes in material costs, manufacturing, transportation, and market conditions.

Prices displayed on our website are intended to provide customers with a general understanding of building package costs and do not represent a binding quote or guarantee of final pricing.

Final project pricing is established during the preconstruction phase and may vary based on project location, applicable building codes, site-specific engineering requirements, design modifications, optional upgrades, and other project-specific considerations.

The final purchase price included components, and scope of services will be confirmed in the executed sales agreement, which will serve as the governing document for all project pricing and specifications.

7. Manufacturing and Production

Building components are fabricated in a controlled manufacturing environment according to approved project specifications.

Manufacturing and delivery preparation generally require approximately 14–16 weeks following the applicable approvals and authorization to proceed.

Estimated production periods are planning guidelines and may change due to material availability, manufacturing capacity, engineering revisions, transportation arrangements, or circumstances outside the Company’s reasonable control.

Changes requested after manufacturing authorization may result in additional charges and schedule adjustments.

8. Shipping, Delivery, and Site Access

Park City Prefab includes delivery of the specified exterior building package to approved project sites within the Canada and continental United States, excluding Alaska and Hawaii, unless otherwise stated in the project agreement.

Customers are responsible for ensuring the designated delivery location can safely accommodate a semi-truck and trailer, including sufficient roadway access, turning clearance, and unloading arrangements.

Where direct access is unavailable or unsuitable, an alternate delivery location may be required.

Additional costs resulting from restricted access, special handling, storage, redelivery, or alternative transportation arrangements may be the customer’s responsibility.

The Company will generally communicate the anticipated delivery window approximately two weeks before shipment, subject to logistical conditions.

9. On-Site Assembly and Construction

Park City Prefab supplies building components intended for assembly by qualified local construction professionals.

Park City Prefab provides approximately two hours of virtual assembly training with the panel manufacturer, generally scheduled within one week of delivery.

Park City Prefab does not act as the general contractor or assume responsibility for the management of on-site construction.

Customers and their contractors are responsible for site safety, construction methods, equipment, labour, inspections, and completion of all work outside the purchased package.

10. Permits, Foundations, and Local Requirements

Park City Prefab provides structural engineering for the building components included in its contracted package.

Foundation engineering is not included in the package and must be completed by an appropriately qualified professional familiar with local site conditions.

Customers are responsible for obtaining required zoning approvals, building permits, inspections, and other governmental authorizations.

Local building requirements, environmental conditions, and site-specific engineering considerations may require modifications to the selected design which may result in additional costs.

Any additional engineering, redesign, or construction work arising from these requirements will be addressed through the applicable project agreement.

11. Published Plans, Renderings, and Specifications

Website photographs, architectural illustrations, floor plans, and renderings are provided to demonstrate design concepts and available building options.

Images may include entry porches, decks, landscaping, furnishings, finishes, site features, and architectural details that are not part of the standard building package.

Published measurements, square footage, materials, and specifications are subject to confirmation during engineering and final project documentation.

The approved construction documents and executed project agreement establish the final requirements for the purchased package.

12. Product Warranties

Park City Prefab includes a 10-year limited manufacturer’s warranty on its structural panels, subject to the applicable written warranty terms, exclusions, and conditions.

Exterior windows and doors are covered by their respective manufacturers’ warranties. Coverage generally ranges from 10–30 years for exterior finishes and 2–10 years for glass defects, depending on the manufacturer and product selected.

Warranty coverage, eligibility, exclusions, claim procedures, and remedies are governed by the applicable written warranty documents.

Damage or defects resulting from improper installation, unauthorized modifications, misuse, inadequate maintenance, or work performed by unrelated third parties may fall outside the applicable warranty coverage.

All warranties are subject to their respective terms, conditions, and exclusions. Nothing in these Terms affects any rights or protections provided to customers under applicable law.

13. Customer and Contractor Responsibilities

Customers are responsible for selecting competent, appropriately licensed contractors and ensuring that construction activities comply with applicable laws and building requirements.

Responsibilities outside the contracted Park City Prefab package include, as applicable, site preparation, foundation construction, utilities, interior framing, mechanical and electrical systems, plumbing, cabinetry, flooring, fixtures, and finishing work.

Park City Prefab is not responsible for the performance or contractual obligations of independently engaged construction professionals.

Customers should review the supplied installation documentation and ensure their contractors understand the requirements of the building system before commencing assembly.

14. Project Changes, Delays, and Cancellations

Project changes must be submitted for review and may require written approval, additional payment, or schedule revisions.

Once engineering or manufacturing activities have commenced, cancellation may result in charges for completed services, committed materials, and other documented project costs, subject to the executed agreement and applicable law.

If unforeseen circumstances affect production or delivery, Park City Prefab will make reasonable efforts to notify the customer and communicate revised expectations.

Specific cancellation rights, payment obligations, and remedies will be established in the applicable project agreement.

15. Website Content and Marketing Materials

The Park City Prefab name, logo, website content, original imagery, architectural presentations, and other proprietary marketing materials may not be reproduced or used commercially without appropriate authorization.

Customers and construction partners may identify Park City Prefab as the supplier of building packages purchased from the Company.

Use of Park City Prefab branding to suggest an authorized dealership, exclusive territory, formal affiliation, or endorsement requires prior written approval.

Dealers, builders, and other business partners must comply with the branding and marketing requirements established in their respective agreements.

16. Limitations of Responsibility

Park City Prefab is responsible for fulfilling the obligations expressly identified in its executed agreements and applicable product warranties.

To the extent permitted by applicable law, the Company is not responsible for losses arising solely from circumstances beyond its contracted scope, including unrelated contractor errors, site deficiencies, unauthorized product alterations, or customer-directed construction decisions.

Any limitation of liability, exclusion of damages, or allocation of risk must be interpreted consistently with applicable law and the specific contractual obligations undertaken by the Company.

Nothing in these Terms excludes liability that cannot legally be limited or waived.

17. Events Outside Reasonable Control

Neither party will be considered in breach solely because performance is prevented or materially delayed by events beyond its reasonable control, including severe weather, natural disasters, transportation interruptions, material shortages, governmental restrictions, labour disruptions, or other comparable circumstances. In the event the buyer(s) delay delivery of completed manufactured materials, beyond 30 days of completion, storage fees may be applicable.

The affected party must provide reasonable notice and take commercially reasonable steps to minimize the impact.

The parties will work together to establish revised performance expectations where appropriate.

18. Applicable Law and Dispute Resolution

These Terms will be interpreted under the laws of [State to be confirmed], subject to any mandatory laws applicable to the transaction.

Before initiating formal legal proceedings, the parties agree to make a reasonable effort to resolve disputes through direct written communication and good-faith discussions.

Any additional dispute-resolution procedures, jurisdictional requirements, or remedies will be governed by the applicable project agreement and controlling law.

19. Relationship to Other Agreements

These website Terms provide general conditions applicable to Park City Prefab products and services.

A separately executed purchase agreement, manufacturing agreement, dealer agreement, or other written contract may establish additional or different terms.

Where an inconsistency exists, the specifically negotiated and executed agreement will control to the extent permitted by law.

If any provision of these Terms is found unenforceable, the remaining provisions will continue to apply.

20. Updates and Contact Information

Park City Prefab may revise these Terms periodically to reflect changes in its operations, product offerings, or legal requirements.

The version accepted at the time of a transaction will apply to that transaction unless the parties subsequently agree otherwise or applicable law requires a different result.

Questions regarding purchases, project requirements, or these Terms may be directed to:

Park City Prefab Works, LLC
Email: info@parkcityprefabworks.com
Business Address: 7533 S Center View CT STE N, Salt Lake City, UT 84084


End of Terms & Conditions